{"id":32207,"date":"2026-04-08T10:13:21","date_gmt":"2026-04-08T09:13:21","guid":{"rendered":"https:\/\/morson-edge.com\/?p=32207"},"modified":"2026-04-08T10:13:22","modified_gmt":"2026-04-08T09:13:22","slug":"managing-decommissioning-at-every-stage-with-the-right-specialist-talent","status":"publish","type":"post","link":"https:\/\/morson-edge.com\/fr_ca\/nouvelles\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/","title":{"rendered":"Managing decommissioning at every stage with the right specialist talent"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Every asset, whether it\u2019s an offshore installation, a subsea system or piece of critical equipment, reaches the same point eventually. The end of its working life. Left unmanaged, degradation doesn\u2019t wait. It accelerates. This is where decommissioning is inevitable. <\/h2>\n\n\n\n<p>As one of the most complex and capital-intensive phases in the asset lifecycle, decommissioning is also driven by specialist talent. The only issue is that there is a widening skills shortage in the oil and gas sector. At Morson, we close the gap.<\/p>\n\n\n\n<p>Oil and gas (O&amp;G) decommissioning is crucial to the <a href=\"https:\/\/morson-edge.com\/fr_ca\/secteurs-dactivite\/lenergie\/transition-energetique\/\">transition \u00e9nerg\u00e9tique<\/a>, shifting from late-life asset management to repurposing infrastructure for carbon capture, hydrogen, and offshore <a href=\"https:\/\/morson-edge.com\/fr_ca\/secteurs-dactivite\/lenergie\/energies-renouvelables\/\">\u00e9nergies renouvelables<\/a>. And the progress depends on specialist engineers, projects leaders, and operations experts who can deliver safely and at pace.<\/p>\n\n\n\n<p>The demand is only growing. Across oil and gas, <a href=\"https:\/\/morson-edge.com\/fr_ca\/secteurs-dactivite\/lenergie\/nucleaire\/\">nucl\u00e9aire<\/a>, and wider <a href=\"https:\/\/morson-edge.com\/fr_ca\/secteurs-dactivite\/lenergie\/\">l'\u00e9nergie<\/a> infrastructure, ageing assets are driving urgent need for skills in dismantling, waste management, and environmental remediation.&nbsp;<\/p>\n\n\n\n<p>En tant que <a href=\"https:\/\/www.linkedin.com\/in\/harryfeest\/\" target=\"_blank\" rel=\"noreferrer noopener\">Senior Consultant \u2013 Energy at Morson Edge<\/a>, I specialise in attracting and retaining specialists, including engineers, project managers, and operations who keep decommissioning on track and transition moving forward.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">A path towards energy transition \u2013 and the workforce challenge behind it&nbsp;<\/h2>\n\n\n\n<p>Decommissioning plays a critical role as offshore oil and gas assets reach the end of their operational life. In the UK, managing late-life assets supports both economic recovery and the government\u2019s commitment to achieving net zero emissions by 2050.<\/p>\n\n\n\n<p>It is essential for environmental protection, safety, and regulatory compliance. By isolating reservoirs and removing ageing infrastructure, decommissioning prevents leaks, reduces long-term liabilities, and mitigates the risks associated with corroded offshore structures. Just as importantly, it frees up space for new energy developments, enabling carbon capture, hydrogen, and offshore renewables to scale.<\/p>\n\n\n\n<p>However, the transition is being held back by a growing skills gap. Around 150,000 people are currently employed in the UK oil and gas sector. Yet the energy transition will require closer to 200,000 workers in the UK alone, and an estimated <a href=\"https:\/\/morson-edge.com\/fr_ca\/nouvelles\/95-denergie-propre-dici-a-2030-si-lon-fournissait-les-talents-necessaires-a-leur-construction\/\">38 million additional professionals globally.<\/a><\/p>\n\n\n\n<p>Oil and gas professionals are central to closing that gap. Their skills are highly transferable and already aligned with the needs of the energy transition:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Expertise in subsea engineering, marine operations, and heavy lifting translates directly into offshore renewables.<\/li>\n\n\n\n<li><a href=\"https:\/\/www.iea.org\/reports\/the-oil-and-gas-industry-in-net-zero-transitions\/executive-summary\">The sector is actively supporting nearly 90% of global CCUS capacity<\/a> and investing in hydrogen, geothermal, and solar.<\/li>\n\n\n\n<li>Industry-wide initiatives, such as offshore energy skills passports, are helping workers move between oil and gas and renewables.<\/li>\n\n\n\n<li>There is a clear need to retrain and redeploy existing workforces, particularly across the North Sea.<\/li>\n<\/ul>\n\n\n\n<p>Decommissioning itself is also evolving. Infrastructure is no longer simply removed. Platforms and pipelines are increasingly repurposed for carbon capture and storage and hydrogen production. With over 12,000 offshore platforms worldwide approaching end of life, the scale of this challenge is significant.<\/p>\n\n\n\n<p>This is why decommissioning matters. It enables the safe retirement of legacy assets while creating the conditions for cleaner infrastructure. But with skills shortages threatening delivery, the risk to both energy transition targets and energy security is real.<\/p>\n\n\n\n<p>This is where I help clients connect with the specialist talent needed to keep decommissioning programmes moving. We also help professionals <a href=\"https:\/\/www.morson.com\/transitioning-skills-oil-and-gas-renewable-energy-jobs\">transition from oil &amp; gas to renewable energy jobs<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The danger of late-stage capability gaps in live or high-risk environments<\/h2>\n\n\n\n<p>Ageing and abandoned infrastructure presents serious challenges. From offshore platforms to pipelines and wells, deterioration introduces safety, environmental, financial, and legal risks.&nbsp;<\/p>\n\n\n\n<p>Decommissioning manages that risk in some of the most complex environments in the energy lifecycle.<\/p>\n\n\n\n<p><strong>Without proper decommissioning:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Residual hydrocarbons can leak from unplugged wells and pipelines<\/li>\n\n\n\n<li>Corroded structures can fail under extreme weather, releasing debris and toxic materials<\/li>\n\n\n\n<li>Greenhouse gases such as methane can escape from legacy assets<\/li>\n\n\n\n<li>Long-term liabilities and remediation costs increase significantly<\/li>\n<\/ul>\n\n\n\n<p>These risks extend beyond oil and gas. Across sectors, leaving infrastructure unmanaged leads to rising costs, inefficiencies, and exposure to operational failure. Delaying decommissioning only compounds the problem. The longer assets are left, the more hazardous and expensive they become to remove.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Regulatory pressure and safety-critical environments<\/h2>\n\n\n\n<p>Decommissioning is one of the most hazardous stages in the oil and gas lifecycle, combining unfamiliar tasks, constantly changing environments, and a workforce often heavily reliant on contractors.<\/p>\n\n\n\n<p>Oil and gas decommissioning is also the final phase of an energy project\u2019s lifecycle. At this stage, safety, leadership, and human performance become decisive. Projects must strictly meet regulatory requirements while dismantling infrastructure, managing waste, and restoring environments.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-secondary-color has-text-color has-link-color wp-elements-d1e2d7d48623e84a73ac52bedf3f35a5\" style=\"font-size:20px\">Key risk areas include:<\/h3>\n\n\n\n<p><strong>Process safety and major accident hazards (MAHs)<\/strong> &#8211; Work near live pipelines or hydrocarbon sources requires precise control to prevent fires, explosions, or loss of containment.<\/p>\n\n\n\n<p><strong>Structural and lifting hazards<\/strong> &#8211; Dismantling ageing infrastructure introduces significant hazards during heavy lifting and subsea operations, particularly where assets have degraded over time.<\/p>\n\n\n\n<p><strong>Environmental contamination<\/strong> &#8211; Improper handling or delays increase the risk of pollution and long-term environmental damage or catastrophes. For instance, <a href=\"https:\/\/www.theguardian.com\/environment\/2025\/may\/07\/abandoned-infrastructure-one-of-the-biggest-polluters-in-the-world-report\">abandoned coalmines and oil and gas wells are one of the biggest world polluters<\/a> or hurricanes which can destroy and move subsea equipment.<\/p>\n\n\n\n<p><strong>Loss of knowledge and fragmented data<\/strong> &#8211; When the data is disconnected across different departments, it simply hampers risk assessments, delays, decision-making, and limits the ability to safely execute decommissioning projects.<\/p>\n\n\n\n<p><strong>Supply chain and specialist labour shortages <\/strong>&#8211; A lack of specialist skills creates bottlenecks in high-risk, technically complex activities.<\/p>\n\n\n\n<p><strong>Regulatory non-compliance<\/strong> &#8211; Missed deadlines or incomplete decommissioning can lead to penalties, increased costs, and reputational damage.<\/p>\n\n\n\n<p>Without specialised knowledge, the decommissioning phase presents critical dangers and safety risks. This is why expertise is crucial. In my work at Morson Edge, providing clients with the assurance that they can navigate the critical stage with highly qualified specialists and confidence is key.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Coordinating complexity across disciplines<\/h2>\n\n\n\n<p>O&amp;G decommissioning is not a single activity. It requires coordination across different sectors, including engineering, construction, and specialist labour.&nbsp;<\/p>\n\n\n\n<p>As it is an increasingly complex, high-stakes process which requires intense, multi-disciplinary coordination, the projects often involve managing risks in hostile ocean environments while meeting regulatory and environmental safety standards.<\/p>\n\n\n\n<p><strong>Therefore, the success depends on how well these interfaces are managed:<\/strong><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Engineering to construction<\/strong><\/h4>\n\n\n\n<p>Detailed planning must translate into executable strategies, which can involve crane vessel operations or cutting techniques. Misalignment leads to delays, scope gaps, and cost overruns, especially when dealing with non-piggable pipelines or degraded assets.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Construction to specialist labour<\/strong> <\/h4>\n\n\n\n<p>This involves coordinating heavy-lift operations and specialised machinery with personnel like ROV (Remote Operated Vehicle) operators, subsea technicians, and structural welders. Safety is paramount here as this interface frequently involves high-risk activities in harsh environments.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Engineering to specialist labour<\/strong> <\/h4>\n\n\n\n<p>Technical expertise must be clearly underwood and applied by on-site experts. This ensures safe and accurate execution. For instance, subsea field engineers can accurately interpret technical plans for subsea removal and that specialised equipment (e.g. cutting tools) aligns with the engineering requirements for structure removal.<\/p>\n\n\n\n<p>These interfaces often determine where projects succeed or fail.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Specialist projects need specialist people<\/h2>\n\n\n\n<p>O&amp;G decommissioning demands a highly skilled, multidisciplinary workforce. Typical roles involve planning and executing the removal, disposal, or repurposing of offshore\/onshore infrastructure at the end of its life.&nbsp;<\/p>\n\n\n\n<p>Key positions include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Decommissioning Managers<\/li>\n\n\n\n<li>Subsea Engineers<\/li>\n\n\n\n<li>Environmental Specialists<\/li>\n\n\n\n<li>Chefs de projet<\/li>\n\n\n\n<li>ROV operators and subsea technicians<\/li>\n\n\n\n<li>Welders, riggers, and offshore trades<\/li>\n<\/ul>\n\n\n\n<p>The highest demand remains concentrated in key hubs such as Aberdeen (UK North Sea) and major UK industrial regions, while globally, markets like Stavanger and Houston continue to compete for the same talent.<\/p>\n\n\n\n<p>The UK alone is expected to <a href=\"https:\/\/www.nstauthority.co.uk\/regulatory-information\/decommissioning\/cost-estimate\/\">spend around \u00a327 billion on offshore decommissioning between 2023 and 2032<\/a>. The scale is clear: the pressure is on skills.<\/p>\n\n\n\n<p>At the same time, the workforce must evolve as the transition will see a significant shift, with <a href=\"https:\/\/www.gov.uk\/government\/consultations\/building-the-north-seas-energy-future\/building-the-north-seas-energy-future-consultation-document-accessible-webpage\">offshore energy jobs projected to grow to 225,000 by 2030<\/a>.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Keeping decommissioning on track<\/h2>\n\n\n\n<p>At Morson, we help clients navigate this complexity. We supply the specialists who keep decommissioning projects on track, on budget and on point. Whether your company is looking for oil &amp; gas, power system or renewable energy specialists, we support clients across the full lifecycle.<\/p>\n\n\n\n<p class=\"has-medium-font-size\"><strong>To connect with the specialist talent, reach out to me at <\/strong><a href=\"mailto:Harry.Feest@morson.com\"><strong>Harry.Feest@morson.com<\/strong><\/a><strong>.<\/strong><\/p>\n\n\n\n<p class=\"has-medium-font-size\"><strong>Or if you\u2019re looking for technical expertise, <a href=\"https:\/\/morson-praxis.com\/industries\/energy\/power-renewables\/oil-gas\/\">Morson Praxis is one of the UK\u2019s leading oil and gas consultancies<\/a>. Our engineering consultancy team successfully delivered projects across the UK, helping clients revitalise their operations through new technologies and smarter tractions methods.<\/strong><\/p>\n\n\n\n<p>Because decommissioning is not really the final stage. But the starting point for what comes next.<\/p>","protected":false},"excerpt":{"rendered":"<p>Every asset, whether it\u2019s an offshore installation, a subsea system or piece of critical equipment, reaches the same point eventually. [&hellip;]<\/p>","protected":false},"author":9,"featured_media":32208,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20],"tags":[39,41,42],"class_list":["post-32207","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncommon-sense","tag-energy-renewables","tag-infrastructure-utilities","tag-nuclear"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Managing decommissioning at every stage with the right specialist talent - Morson Edge<\/title>\n<meta name=\"description\" content=\"All assets reach the end. Left unmanaged, risk accelerates. Decommissioning is inevitable. With Morson, you can control it with the right expertise.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/morson-edge.com\/fr_ca\/nouvelles\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/\" \/>\n<meta property=\"og:locale\" content=\"fr_CA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Managing decommissioning at every stage with the right specialist talent - Morson Edge\" \/>\n<meta property=\"og:description\" content=\"All assets reach the end. Left unmanaged, risk accelerates. Decommissioning is inevitable. With Morson, you can control it with the right expertise.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/morson-edge.com\/fr_ca\/nouvelles\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/\" \/>\n<meta property=\"og:site_name\" content=\"Morson Edge\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-08T09:13:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-08T09:13:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/morson-edge.com\/wp-content\/uploads\/sites\/4\/2026\/04\/AdobeStock_697908552-scaled.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1435\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"justynamatuszak\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"justynamatuszak\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimation du temps de lecture\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/\"},\"author\":{\"name\":\"justynamatuszak\",\"@id\":\"https:\/\/morson-edge.com\/#\/schema\/person\/f5fece97e147ba327bac785435bd4595\"},\"headline\":\"Managing decommissioning at every stage with the right specialist talent\",\"datePublished\":\"2026-04-08T09:13:21+00:00\",\"dateModified\":\"2026-04-08T09:13:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/\"},\"wordCount\":1424,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/morson-edge.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/#primaryimage\"},\"thumbnailUrl\":\"\/wp-content\/uploads\/sites\/4\/2026\/04\/AdobeStock_697908552-scaled.jpeg\",\"keywords\":[\"Energy &amp; Renewables\",\"Infrastructure &amp; Utilities\",\"Nuclear\"],\"articleSection\":[\"Uncommon Sense\"],\"inLanguage\":\"fr-CA\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/\",\"url\":\"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/\",\"name\":\"Managing decommissioning at every stage with the right specialist talent - Morson Edge\",\"isPartOf\":{\"@id\":\"https:\/\/morson-edge.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/#primaryimage\"},\"thumbnailUrl\":\"\/wp-content\/uploads\/sites\/4\/2026\/04\/AdobeStock_697908552-scaled.jpeg\",\"datePublished\":\"2026-04-08T09:13:21+00:00\",\"dateModified\":\"2026-04-08T09:13:22+00:00\",\"description\":\"All assets reach the end. Left unmanaged, risk accelerates. Decommissioning is inevitable. With Morson, you can control it with the right expertise.\",\"breadcrumb\":{\"@id\":\"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/#breadcrumb\"},\"inLanguage\":\"fr-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/#primaryimage\",\"url\":\"\/wp-content\/uploads\/sites\/4\/2026\/04\/AdobeStock_697908552-scaled.jpeg\",\"contentUrl\":\"\/wp-content\/uploads\/sites\/4\/2026\/04\/AdobeStock_697908552-scaled.jpeg\",\"width\":2560,\"height\":1435},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/morson-edge.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Managing decommissioning at every stage with the right specialist talent\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/morson-edge.com\/#website\",\"url\":\"https:\/\/morson-edge.com\/\",\"name\":\"Morson Edge\",\"description\":\"Supplying specialist talent\",\"publisher\":{\"@id\":\"https:\/\/morson-edge.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/morson-edge.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-CA\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/morson-edge.com\/#organization\",\"name\":\"Morson Edge\",\"url\":\"https:\/\/morson-edge.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\/\/morson-edge.com\/#\/schema\/logo\/image\/\",\"url\":\"\/wp-content\/uploads\/sites\/4\/2025\/10\/Morson_Logo_EDGE_RGB-scaled.png\",\"contentUrl\":\"\/wp-content\/uploads\/sites\/4\/2025\/10\/Morson_Logo_EDGE_RGB-scaled.png\",\"width\":2560,\"height\":296,\"caption\":\"Morson Edge\"},\"image\":{\"@id\":\"https:\/\/morson-edge.com\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/morson-edge.com\/#\/schema\/person\/f5fece97e147ba327bac785435bd4595\",\"name\":\"justynamatuszak\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\/\/morson-edge.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b19dcfae3a9409d8c4e308ea06dbc4ceaa472defd5673f592c294e60c039b522?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b19dcfae3a9409d8c4e308ea06dbc4ceaa472defd5673f592c294e60c039b522?s=96&d=mm&r=g\",\"caption\":\"justynamatuszak\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Managing decommissioning at every stage with the right specialist talent - Morson Edge","description":"All assets reach the end. Left unmanaged, risk accelerates. Decommissioning is inevitable. With Morson, you can control it with the right expertise.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/morson-edge.com\/fr_ca\/nouvelles\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/","og_locale":"fr_CA","og_type":"article","og_title":"Managing decommissioning at every stage with the right specialist talent - Morson Edge","og_description":"All assets reach the end. Left unmanaged, risk accelerates. Decommissioning is inevitable. With Morson, you can control it with the right expertise.","og_url":"https:\/\/morson-edge.com\/fr_ca\/nouvelles\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/","og_site_name":"Morson Edge","article_published_time":"2026-04-08T09:13:21+00:00","article_modified_time":"2026-04-08T09:13:22+00:00","og_image":[{"width":2560,"height":1435,"url":"https:\/\/morson-edge.com\/wp-content\/uploads\/sites\/4\/2026\/04\/AdobeStock_697908552-scaled.jpeg","type":"image\/jpeg"}],"author":"justynamatuszak","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"justynamatuszak","Estimation du temps de lecture":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/#article","isPartOf":{"@id":"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/"},"author":{"name":"justynamatuszak","@id":"https:\/\/morson-edge.com\/#\/schema\/person\/f5fece97e147ba327bac785435bd4595"},"headline":"Managing decommissioning at every stage with the right specialist talent","datePublished":"2026-04-08T09:13:21+00:00","dateModified":"2026-04-08T09:13:22+00:00","mainEntityOfPage":{"@id":"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/"},"wordCount":1424,"commentCount":0,"publisher":{"@id":"https:\/\/morson-edge.com\/#organization"},"image":{"@id":"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/#primaryimage"},"thumbnailUrl":"\/wp-content\/uploads\/sites\/4\/2026\/04\/AdobeStock_697908552-scaled.jpeg","keywords":["Energy &amp; Renewables","Infrastructure &amp; Utilities","Nuclear"],"articleSection":["Uncommon Sense"],"inLanguage":"fr-CA","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/","url":"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/","name":"Managing decommissioning at every stage with the right specialist talent - Morson Edge","isPartOf":{"@id":"https:\/\/morson-edge.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/#primaryimage"},"image":{"@id":"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/#primaryimage"},"thumbnailUrl":"\/wp-content\/uploads\/sites\/4\/2026\/04\/AdobeStock_697908552-scaled.jpeg","datePublished":"2026-04-08T09:13:21+00:00","dateModified":"2026-04-08T09:13:22+00:00","description":"All assets reach the end. Left unmanaged, risk accelerates. Decommissioning is inevitable. With Morson, you can control it with the right expertise.","breadcrumb":{"@id":"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/#breadcrumb"},"inLanguage":"fr-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/"]}]},{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/#primaryimage","url":"\/wp-content\/uploads\/sites\/4\/2026\/04\/AdobeStock_697908552-scaled.jpeg","contentUrl":"\/wp-content\/uploads\/sites\/4\/2026\/04\/AdobeStock_697908552-scaled.jpeg","width":2560,"height":1435},{"@type":"BreadcrumbList","@id":"https:\/\/morson-edge.com\/news\/managing-decommissioning-at-every-stage-with-the-right-specialist-talent\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/morson-edge.com\/"},{"@type":"ListItem","position":2,"name":"Managing decommissioning at every stage with the right specialist talent"}]},{"@type":"WebSite","@id":"https:\/\/morson-edge.com\/#website","url":"https:\/\/morson-edge.com\/","name":"Morson Edge","description":"Fournir des talents sp\u00e9cialis\u00e9s","publisher":{"@id":"https:\/\/morson-edge.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/morson-edge.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-CA"},{"@type":"Organization","@id":"https:\/\/morson-edge.com\/#organization","name":"Morson Edge","url":"https:\/\/morson-edge.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/morson-edge.com\/#\/schema\/logo\/image\/","url":"\/wp-content\/uploads\/sites\/4\/2025\/10\/Morson_Logo_EDGE_RGB-scaled.png","contentUrl":"\/wp-content\/uploads\/sites\/4\/2025\/10\/Morson_Logo_EDGE_RGB-scaled.png","width":2560,"height":296,"caption":"Morson Edge"},"image":{"@id":"https:\/\/morson-edge.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/morson-edge.com\/#\/schema\/person\/f5fece97e147ba327bac785435bd4595","name":"justynamatuszak","image":{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/morson-edge.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b19dcfae3a9409d8c4e308ea06dbc4ceaa472defd5673f592c294e60c039b522?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b19dcfae3a9409d8c4e308ea06dbc4ceaa472defd5673f592c294e60c039b522?s=96&d=mm&r=g","caption":"justynamatuszak"}}]}},"_links":{"self":[{"href":"https:\/\/morson-edge.com\/fr_ca\/wp-json\/wp\/v2\/posts\/32207","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/morson-edge.com\/fr_ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/morson-edge.com\/fr_ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/morson-edge.com\/fr_ca\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/morson-edge.com\/fr_ca\/wp-json\/wp\/v2\/comments?post=32207"}],"version-history":[{"count":7,"href":"https:\/\/morson-edge.com\/fr_ca\/wp-json\/wp\/v2\/posts\/32207\/revisions"}],"predecessor-version":[{"id":32216,"href":"https:\/\/morson-edge.com\/fr_ca\/wp-json\/wp\/v2\/posts\/32207\/revisions\/32216"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/morson-edge.com\/fr_ca\/wp-json\/wp\/v2\/media\/32208"}],"wp:attachment":[{"href":"https:\/\/morson-edge.com\/fr_ca\/wp-json\/wp\/v2\/media?parent=32207"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/morson-edge.com\/fr_ca\/wp-json\/wp\/v2\/categories?post=32207"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/morson-edge.com\/fr_ca\/wp-json\/wp\/v2\/tags?post=32207"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}